City of Montpelier - 2026 WTP Filter Improvements

$100.00

The Project generally consists of the replacement in kind of the existing water filter

#1. The filter replacement generally consists of the following items: removal /

temporary route / reinstallation / replacement of internal electric, chemical feed,

natural gas pipe, roof materials, insulation, trusses, WTP filter (Tonka, model: DL6)

, connected pipes, valves, mag meters, site restoration, and all other ancillary and

supporting items to make a complete operational WTP system. WTP must remain

fully operational with a minimum of one (1) filter in service at all times.

The Project generally consists of the supply and installation of replacement water

meters throughout the water distribution system and the installation of the two (2)

gateways with antennas. and all other ancillary and supporting items to make a

complete operational automated water meter reading system.

The Project generally consists of the replacement in kind of the existing water filter

#1. The filter replacement generally consists of the following items: removal /

temporary route / reinstallation / replacement of internal electric, chemical feed,

natural gas pipe, roof materials, insulation, trusses, WTP filter (Tonka, model: DL6)

, connected pipes, valves, mag meters, site restoration, and all other ancillary and

supporting items to make a complete operational WTP system. WTP must remain

fully operational with a minimum of one (1) filter in service at all times.

The Project generally consists of the supply and installation of replacement water

meters throughout the water distribution system and the installation of the two (2)

gateways with antennas. and all other ancillary and supporting items to make a

complete operational automated water meter reading system.